# Argentina LeoLabs radar investigation

> Developing situation record from CLSTR: https://clstr.news/situations/argentina-leolabs-radar-investigation
> Updated: 2026-11-13T05:00:00.000Z. Sources: 9. Developments: 4.

A legislative special commission in Tierra del Fuego is investigating the authorization and installation of a LeoLabs radar, owned by British capital, at the El Relincho estate in Tolhuin.

Initial proceedings focused on determining responsibility for the installation. Several current and former officials failed to attend scheduled testimonies, prompting legislators to consider moving sessions to Río Grande to secure evidence. The commission has been reviewing documentary evidence and planning site visits requested by Malvinas veterans.

As the investigation progressed, Daniel Guzmán, director of Agenda Malvinas, accused the provincial government of Melella of systematically obstructing the process. During an ocular inspection on November 10, 2026, which included the Provincial Energy Directorate and representatives from the Ushuaia Malvinas War Veterans Center, legislators and technical experts confirmed that the radar installation currently lacks an electrical power supply. While the commission was unable to enter the fenced premises, they are awaiting a formal report from the provincial environmental authority.

Guzmán has further criticized the administration of Gustavo Melella for hindering the commission, specifically noting that proposals by former minister Sonia Castiglione to provide written responses rather than in-person testimony prevent necessary follow-up questioning. While preliminary electrical checks by local energy personnel and an engineer from the National University of Tierra del Fuego found no evidence of clandestine power supplies in the vicinity, officials noted this does not constitute a full evaluation of the device's operation. The probe continues to examine how the installation was authorized and whether officials in the energy and environmental sectors bear responsibility, amid previous concerns from the National Ministry of Defense regarding potential national security implications.

## Timeline

### 2026-11-13: Tierra del Fuego legislative probe faces alleged obstruction over LeoLabs radar

Legislators investigating the LeoLabs radar in Tolhuin, Tierra del Fuego, report being blocked from accessing the facility and face allegations of government obstruction.

2 sources. https://clstr.news/cluster/tierra-del-fuego-legislative-probe-faces-alleged-obstruction-over-leolabs-radar

### 2026-11-10: Tierra del Fuego investigation into LeoLabs radar faces alleged obstruction

Tierra del Fuego officials face accusations of obstructing a legislative probe into a LeoLabs radar installation in Tolhuin, sparking tension with war veterans.

2 sources. https://clstr.news/cluster/tierra-del-fuego-investigation-into-leolabs-radar-faces-alleged-obstruction

### 2026-11-10: Leolabs radar inspection reveals lack of electricity in Tierra del Fuego

An investigation into the Leolabs radar in Tierra del Fuego found the installation lacks electricity during an official inspection aimed at reviewing its authorization and security implications.

3 sources. https://clstr.news/cluster/leolabs-radar-inspection-reveals-lack-of-electricity-in-tierra-del-fuego

### 2026-11-06: Argentina legislative commission investigates LeoLabs radar installation

An Argentine legislative commission is investigating the authorization of a British-owned LeoLabs radar in Tolhuin after several key officials failed to appear for scheduled testimonies.

3 sources. https://clstr.news/cluster/argentina-legislative-commission-investigates-leolabs-radar-installation

---
Cite as: Argentina LeoLabs radar investigation. CLSTR, https://clstr.news/situations/argentina-leolabs-radar-investigation
