# Chevron Aseng gas project development

> Developing situation record from CLSTR: https://clstr.news/situations/chevron-aseng-gas-project-development
> Updated: 2026-11-07T04:10:07.000Z. Sources: 4. Developments: 2.

Chevron has awarded a contract to EnerMech for the Aseng gas development offshore Equatorial Guinea. The project involves providing specialist pipeline pre-commissioning services, project management, and engineering for approximately 19 kilometers of rigid production flowline. This infrastructure will connect the Aseng field to the existing Alen platform to transport subsea natural gas.

Through its subsidiary Noble Energy EG, Chevron expects first gas production from the field to begin in 2028. The company plans to deploy a drilling rig in early 2027 to drill a development well. The project is intended to utilize existing offshore infrastructure to help sustain Equatorial Guinea’s liquefied natural gas exports through the mid-2030s.

## Timeline

### 2026-11-07: Chevron awards EnerMech contract for Equatorial Guinea gas project

EnerMech will prepare a 19-kilometer subsea pipeline for Chevron’s Aseng gas project in Equatorial Guinea, with production expected to begin in 2028.

2 sources. https://clstr.news/cluster/chevron-awards-enermech-contract-for-equatorial-guinea-gas-project

### 2026-11-04: EnerMech secures Chevron contract for Equatorial Guinea gas project

EnerMech has secured a contract from Chevron to provide pre-commissioning services for a 19-kilometer gas flowline at the Aseng development offshore Equatorial Guinea.

2 sources. https://clstr.news/cluster/enermech-secures-chevron-contract-for-equatorial-guinea-gas-project

---
Cite as: Chevron Aseng gas project development. CLSTR, https://clstr.news/situations/chevron-aseng-gas-project-development
