# Czech-Slovak Lanžhot-Brodské bridge reconstruction

> Developing situation record from CLSTR: https://clstr.news/situations/czech-slovak-lanhot-brodsk-bridge-reconstruction
> Updated: 2026-10-05T06:00:00.000Z. Sources: 5. Developments: 2.

Czech and Slovak road administrators have agreed to reconstruct a bridge on road II/425 located between Lanžhot and Brodské. The Czech side has obtained a building permit and is finalizing documentation, while the Slovak side expects to receive its permit in October. 

The two nations will jointly select a contractor, with the Czech side leading the procurement process to manage differences in legislation, currency, and VAT requirements. The project is estimated to cost 205 million CZK and is scheduled to begin in 2027. The bridge has been closed since January of the previous year due to an emergency condition caused by prior flooding.

## Timeline

### 2026-10-05: Kladno to build new bridge as Slovak residency laws change

Kladno plans a 20 million CZK pedestrian bridge to restore local connectivity, while Slovakia prepares for new residency law changes effective September 2026.

3 sources. https://clstr.news/cluster/kladno-to-build-new-bridge-as-slovak-residency-laws-change

### 2026-09-21: Czech and Slovak authorities plan Lanžhot-Brodské bridge reconstruction

Czech and Slovak authorities have agreed to a joint procurement process for the reconstruction of the Lanžhot – Brodské bridge, with works expected to begin in 2027 at an estimated cost of 205 million CZK.

2 sources. https://clstr.news/cluster/czech-and-slovak-authorities-plan-lanhot-brodsk-bridge-reconstruction

---
Cite as: Czech-Slovak Lanžhot-Brodské bridge reconstruction. CLSTR, https://clstr.news/situations/czech-slovak-lanhot-brodsk-bridge-reconstruction
