# Grupo Moura industrial expansion in Pernambuco

> Developing situation record from CLSTR: https://clstr.news/situations/grupo-moura-industrial-expansion-in-pernambuco
> Updated: 2026-11-10T01:10:29.000Z. Sources: 6. Developments: 3.

Grupo Moura has initiated several strategic developments in the Agreste region of Pernambuco to strengthen its industrial presence and supply chain.

In October 2026, the company partnered with the Brazilian Micro and Small Business Support Service (Sebrae) to launch ‘Conexões Corporativas’. This supplier development program provides training, consultancy, and monitoring to 27 small businesses through August 2027, focusing on management, innovation, and sustainable practices to bolster the regional ecosystem.

By November 2026, Grupo Moura announced a R$ 200 million investment to expand its energy storage system (Bess) factory in Belo Jardim. Conducted in partnership with the Chinese company CATL, the expansion aims for an annual capacity exceeding 8 GWh. The project involves importing equipment from China, with production expected to begin in the second half of 2027 to supply upcoming battery auctions. The company intends to achieve nationalization rates between 50% and 60% to meet local content requirements for BNDES financing.

As of November 2026, the company is positioning itself for Brazil’s energy storage auctions regulated by the National Electric Energy Agency (Aneel), scheduled for December 2 and 4. This partnership with CATL seeks to leverage global leadership in BESS technology to meet the local content criteria required for these auctions.

## Claims

- Moura launched the M100HA battery for agricultural machinery at Fenatran 2026. (reported by 2 sources)
- The Brazilian grain harvest for 2026/27 is projected to reach 367.1 million tons. (reported by 2 sources)
- Anfavea recorded a 15.8% drop in agricultural machinery sales from January to August 2026. (reported by 2 sources)
- Grupo Moura is investing R$ 200 million to expand its energy storage systems factory in Belo Jardim, Pernambuco. (reported by 1 source)
- The factory expansion aims to achieve an annual capacity of over 8 GWh. (reported by 1 source)
- Moura is partnering with the Chinese company CATL for energy storage and vehicle electrification. (reported by 1 source)
- Moura handles manufacturing and local control, while CATL handles commercialization. (reported by 1 source)
- The company aims for a nationalization rate between 50% and 60% to meet BNDES requirements. (reported by 1 source)

## Timeline

### 2026-11-10: Grupo Moura invests R$ 200 million in energy storage factory

Grupo Moura is investing R$ 200 million to expand its energy storage factory in Pernambuco, aiming for 8 GWh annual capacity in partnership with CATL.

4 sources. https://clstr.news/cluster/grupo-moura-invests-r-200-million-in-energy-storage-factory

### 2026-11-09: Energy storage companies target Brazil auctions

Trina Storage and a Baterias Moura-CATL partnership are targeting Brazil’s December energy storage auctions to supply battery systems and expand local manufacturing.

3 sources. https://clstr.news/cluster/energy-storage-companies-target-brazil-auctions

### 2026-10-23: Baterias Moura and Sebrae launch supplier development program

Baterias Moura and Sebrae have launched the ‘Conexões Corporativas’ program to train 27 small suppliers in Pernambuco, Brazil, through 2027.

4 sources. https://clstr.news/cluster/baterias-moura-and-sebrae-launch-supplier-development-program

---
Cite as: Grupo Moura industrial expansion in Pernambuco. CLSTR, https://clstr.news/situations/grupo-moura-industrial-expansion-in-pernambuco
