# Gunung Ungaran geothermal project opposition

> Live situation record from CLSTR: https://clstr.news/situations/gunung-ungaran-geothermal-project-opposition
> Updated: 2026-09-05T12:51:26.000Z. Sources: 5. Developments: 2.

A proposed geothermal energy project in the Gunung Ungaran area of Central Java, designated as a National Strategic Project, has faced significant local opposition. Initial concerns centered on the potential for environmental damage and the disruption of vital drinking water sources for Semarang City.

In response to these concerns, PT PLN (Persero) clarified that the project is currently in the planning and feasibility study stage, rather than the construction or drilling phase. The company stated that its ongoing assessments include technical, safety, environmental, and social factors, as well as the preservation of cultural heritage. 

Legislators and residents have called for a re-evaluation of the project, citing specific risks to local biodiversity, such as the endangered Javan Hawk-eagle, and potential impacts on the historical Gedong Songo Temple complex.

## Timeline

### 2026-09-05: Gunung Ungaran geothermal project remains in study phase amid local concerns

PLN clarifies that the Gunung Ungaran geothermal project is still in the study phase amid calls from regional officials to re-evaluate its impact on water sources and cultural heritage sites.

4 sources. https://clstr.news/cluster/gunung-ungaran-geothermal-project-remains-in-study-phase-amid-local-concerns

### 2026-09-03: Gunung Ungaran geothermal project faces local opposition

Central Java officials are seeking dialogue with residents opposing a geothermal project in Gunung Ungaran due to concerns over environmental safety and the preservation of local water sources.

2 sources. https://clstr.news/cluster/gunung-ungaran-geothermal-project-faces-local-opposition

---
Cite as: Gunung Ungaran geothermal project opposition. CLSTR, https://clstr.news/situations/gunung-ungaran-geothermal-project-opposition
