# Hanoi Red River urban planning and boulevard development

> Developing situation record from CLSTR: https://clstr.news/situations/hanoi-red-river-urban-planning-adjustment
> Updated: 2026-11-23T14:52:14.000Z. Sources: 17. Developments: 4.

Hanoi authorities, led by the People’s Committee, have approved a major 1/5000 scale adjustment to the Red River urban subdivision planning. Signed by Chairman Vu Dai Thang, the plan covers approximately 11,418 hectares between Hong Ha Bridge and Me So Bridge, spanning 16 wards and communes. The development designates the river as a strategic axis for commerce, culture, innovation, and green space, guided by principles of safety, ecology, and transportation.

Infrastructure must be validated by hydrological models to ensure flood control and climate change adaptation. The project aims to accommodate a population between 800,000 and 1.2 million people. A central component involves reorganizing residential areas outside the dikes through a phased approach of relocation, resettlement, and redevelopment to improve social security and living standards.

Expanding on this urban framework, the Hanoi People's Committee has approved the 1/500 scale planning for two major landscape boulevard axes totaling approximately 79 kilometers. The Ta Hong route, or Left Bank axis, covers 35.04 km from the Hong Ha Bridge intersection to Bat Trang, passing through eight administrative areas. To protect historical and religious sites such as Den Rung and Den Mau Thoai Phuc Xa, the road width will be narrowed to 49.5 meters in specific sections. 

The Huu Hong route, or Right Bank axis, covers approximately 44.3 km from the Hong Ha Bridge intersection to the Me So Bridge intersection, passing through nine areas. This route includes a 6-lane main road and a section under the Long Bien Bridge featuring a semi-underground design with a 66-meter width. Both boulevards are designed to connect with eight bridges and will feature eight major multi-level interchanges. A consortium including Dai Quang Minh, THACO, and Hoa Phat has been assigned to lead the public consultation process for the Right Bank axis.

## Timeline

### 2026-11-23: Hanoi approves landscape boulevard projects along Red River

Hanoi has approved planning for two major landscape boulevards along the Red River, totaling nearly 80km of new urban infrastructure.

7 sources. https://clstr.news/cluster/hanoi-approves-red-river-landscape-boulevard-project

### 2026-11-19: Hanoi updates urban planning for To Lich River and Red River zones

Hanoi is implementing new urban planning strategies to rehabilitate the To Lich River and develop a strategic ecological and economic corridor along the Red River.

2 sources. https://clstr.news/cluster/hanoi-updates-urban-planning-for-to-lich-river-and-red-river-zones

### 2026-11-16: Hanoi approves Red River urban planning and relocation zones

Hanoi has approved a new Red River urban plan, identifying four key areas for relocation to ensure flood safety, infrastructure development, and central urban growth.

3 sources. https://clstr.news/cluster/hanoi-approves-red-river-urban-planning-and-relocation-zones

### 2026-11-13: Hanoi approves Red River urban planning adjustment

Hanoi has approved a 11,418-hectare urban planning adjustment for the Red River area, focusing on flood safety, ecological preservation, and the relocation of residential areas outside the dikes.

12 sources. https://clstr.news/cluster/hanoi-approves-red-river-urban-planning-adjustment

---
Cite as: Hanoi Red River urban planning and boulevard development. CLSTR, https://clstr.news/situations/hanoi-red-river-urban-planning-adjustment
