# Havlíčkův Brod bridge construction for nuclear transport

> Live situation record from CLSTR: https://clstr.news/situations/havlkv-brod-bridge-construction-for-nuclear-transport
> Updated: 2026-08-26T04:55:06.000Z. Sources: 5. Developments: 2.

Construction has commenced on a new bridge in Havlíčkův Brod designed to support the transport of oversized components for the Dukovany nuclear power plant. The project, overseen by the Road and Motorway Directorate (ŘSD), has entered the foundation stage with the drilling of over 70 large-diameter pilot piles. 

The new structure is engineered to carry loads up to 900 tonnes. Following the demolition of the previous bridge in mid-May, the general contractor, Strabag, is managing the works, which are expected to allow for first traffic during the second half of next year.

## Timeline

### 2026-08-26: Havlíčkův Brod expands cycling network and repurposes railway bridge

Havlíčkův Brod is expanding its cycling network, including plans to repurpose an old railway bridge over the Sázava river into a pedestrian and cyclist path with a cafe.

5 sources. https://clstr.news/cluster/havlkv-brod-expands-cycling-network-and-repurposes-railway-bridge

### 2026-08-03: Havlíčkův Brod bridge project to support Dukovany nuclear plant transport

A new Havlíčkův Brod bridge, costing over 158 million CZK, will support 900‑ton loads for Dukovany nuclear plant; foundation work with 70+ piles underway, first traffic expected next year.

6 sources. https://clstr.news/cluster/havlkv-brod-bridge-project-to-support-dukovany-nuclear-plant-transport

---
Cite as: Havlíčkův Brod bridge construction for nuclear transport. CLSTR, https://clstr.news/situations/havlkv-brod-bridge-construction-for-nuclear-transport
