# Infrastructure projects in Barcelona and Blanes

> Developing situation record from CLSTR: https://clstr.news/situations/infrastructure-projects-in-barcelona-and-blanes
> Updated: 2026-11-06T06:00:00.000Z. Sources: 4. Developments: 2.

In October 2026, the Barcelona City Council announced night-time closures on the Ronda Litoral (B-10) near Moll de la Fusta. The 740,000 euro project aims to repair water leaks and pavement deterioration between access points 21 and 22, with work scheduled to last approximately two months.

By November 2026, additional infrastructure works were announced. In Barcelona, the remodeling of the Dipòsit del Rei Martí roof in the Sarrià-Sant Gervasi district was scheduled to begin on November 9. This project, part of the city’s Climate Plan, includes installing energy-efficient lighting and improving accessibility through new stairs and an elevator. Simultaneously, asphalt renovation works were planned for Passeig de Mar in Blanes, scheduled from November 8 to November 27, with night-time shifts to minimize mobility disruptions.

## Timeline

### 2026-11-06: Infrastructure projects announced in Barcelona and Blanes

Barcelona will begin remodeling the Dipòsit del Rei Martí roof on November 9, while Blanes will conduct night-time asphalt repairs on Passeig de Mar through late November.

4 sources. https://clstr.news/cluster/infrastructure-projects-announced-in-barcelona-and-blanes

### 2026-10-12: Barcelona implements night-time Ronda Litoral closures for repairs

Barcelona will implement night-time closures on the Ronda Litoral near Moll de la Fusta for two months starting October 13 to perform essential infrastructure repairs.

4 sources. https://clstr.news/cluster/barcelona-implements-night-time-ronda-litoral-closures-for-repairs

---
Cite as: Infrastructure projects in Barcelona and Blanes. CLSTR, https://clstr.news/situations/infrastructure-projects-in-barcelona-and-blanes
