# Lippeverband wastewater management developments

> Developing situation record from CLSTR: https://clstr.news/situations/lippeverband-wastewater-management-developments
> Updated: 2026-11-17T08:00:00.000Z. Sources: 4. Developments: 2.

The Lippeverband has announced plans to modernize the wastewater treatment plant in Unna-Hemmerde. The project involves replacing a 1991 facility with a new plant using membrane filter technology to increase capacity by 75 percent. Construction is slated to begin in 2027, with an expected operational date in 2032. The expansion will redirect wastewater from Fröndenberg-Frömern and Ostbüren to the site to improve phosphorus and nitrogen removal.

Separately, the Lippeverband and Emschergenossenschaft reported a significant decrease in the total volume of wastewater treated across approximately 60 plants in 2025 compared to 2024. This decline, which saw treated volumes drop from over 636 million cubic meters to approximately 463 million cubic meters, was attributed to low precipitation levels in the Lippe and Emscher regions.

## Claims

- Low precipitation is the reason for the decrease in wastewater throughput. (reported by 4 sources)
- The combined wastewater treated in Dorsten and Schermbeck in 2025 was approximately 11.3 million cubic meters. (reported by 3 sources)
- The wastewater volume in Dorsten-Holsterhausen decreased by about 32 percent in 2025 compared to the previous year. (reported by 3 sources)
- Average rainfall in the Lippe region in 2025 was approximately 565 mm. (reported by 3 sources)
- The German Association for Water Management, Wastewater and Waste (DWA) reported a decrease in wastewater per capita from 97 to 79 cubic meters. (reported by 3 sources)
- Emschergenossenschaft and Lippeverband treated 463,150,945 cubic meters of wastewater in 2025. (reported by 1 source)
- The volume of wastewater treated in 2025 was lower than the 636,364,691 cubic meters treated in 2024. (reported by 1 source)
- The Bönen wastewater treatment plant treated 5,622,394 cubic meters of wastewater in 2025. (reported by 1 source)

## Timeline

### 2026-11-17: Lippeverband and Emschergenossenschaft report significant drop in wastewater treatment

Germany's Emschergenossenschaft and Lippeverband reported a major drop in wastewater treated in 2025 due to low rainfall and drought conditions.

4 sources. https://clstr.news/cluster/lippeverband-and-emschergenossenschaft-report-significant-drop-in-wastewater-treatment

### 2026-10-22: Lippeverband plans new wastewater treatment plant in Unna-Hemmerde

The Lippeverband will replace the Unna-Hemmerde wastewater plant by 2032, increasing capacity by 75 percent to include wastewater from Fröndenberg.

5 sources. https://clstr.news/cluster/lippeverband-plans-new-wastewater-treatment-plant-in-unna-hemmerde

---
Cite as: Lippeverband wastewater management developments. CLSTR, https://clstr.news/situations/lippeverband-wastewater-management-developments
