# Madrid infrastructure and emergency management activities

> Developing situation record from CLSTR: https://clstr.news/situations/madrid-infrastructure-and-emergency-management-activities
> Updated: 2026-11-12T08:30:00.000Z. Sources: 6. Developments: 2.

Recent activities in Madrid involve both emergency preparedness and infrastructure maintenance. Madrid Calle 30 conducted its annual emergency drill in the M-30 tunnels, involving over 200 participants to test municipal response capabilities through simulated vehicle accidents and fires.

Separately, the Ministry of Transport and Sustainable Mobility has initiated a 7.5 million euro project to repair and replace a bridge deck on the M-40 highway near the Sanchinarro neighborhood. This work includes the assembly of a new metallic box girder bridge deck and has necessitated scheduled traffic closures and diversions on the M-40.

## Timeline

### 2026-11-12: Madrid M-40 highway facing traffic closures for bridge repairs

Major traffic closures and diversions are scheduled on Madrid's M-40 highway from November 12 to 15 due to a 7.5 million euro bridge repair project near Sanchinarro.

4 sources. https://clstr.news/cluster/madrid-m-40-highway-facing-traffic-closures-for-bridge-repairs

### 2026-11-11: Madrid Calle 30 conducts annual emergency drill in M-30 tunnels

Madrid Calle 30 held its annual emergency drill in the M-30 tunnels, simulating multi-vehicle accidents and electric vehicle fires to test municipal response protocols.

3 sources. https://clstr.news/cluster/madrid-calle-30-conducts-annual-emergency-drill-in-m-30-tunnels

---
Cite as: Madrid infrastructure and emergency management activities. CLSTR, https://clstr.news/situations/madrid-infrastructure-and-emergency-management-activities
