# Mauthausen Danube bridge construction

> Live situation record from CLSTR: https://clstr.news/situations/mauthausen-danube-bridge-construction
> Updated: 2026-08-26T16:00:00.000Z. Sources: 2. Developments: 2.

Construction of a new Danube bridge in Mauthausen is scheduled to commence in autumn 2028. The project has faced decades of delays stemming from political disagreements between states, legal disputes, and environmental procedures.

Due to these timeline shifts, the existing bridge, which has been in operation since 1961, requires extensive renovations. This will necessitate a complete closure of the current Danube crossing for three months during the summer of 2028, causing significant detours for commuters. 

Project costs have increased significantly from an initial 2018 estimate of 125 million euros to current estimates of approximately 230 million euros.

## Timeline

### 2026-08-26: Mauthausen Danube bridge construction set for 2028

Construction of the new Mauthausen Danube bridge is set for autumn 2028. The existing bridge will face a three-month closure in summer 2028 for repairs, with project costs rising to 230 million euros.

2 sources. https://clstr.news/cluster/mauthausen-danube-bridge-construction-set-for-2028

### 2026-08-14: Neckarbrücke bridge construction delayed until 2028

The new Neckarbrücke bridge between Ladenburg and Mannheim is delayed until summer 2028 due to technical difficulties involving the final pillar and heavy steel components.

2 sources. https://clstr.news/cluster/neckarbrcke-bridge-construction-delayed-until-2028

---
Cite as: Mauthausen Danube bridge construction. CLSTR, https://clstr.news/situations/mauthausen-danube-bridge-construction
