# Neoenergia infrastructure and service management in Brazil

> Live situation record from CLSTR: https://clstr.news/situations/neoenergia-infrastructure-and-service-management-in-brazil
> Updated: 2026-10-27T16:28:43.000Z. Sources: 4. Developments: 2.

Neoenergia has undertaken various operations to manage utility infrastructure and service quality across different Brazilian regions.

In Bahia, the company addressed power fluctuations and outages in Cabrobó following reports of financial losses from local businesses. Concurrently, Neoenergia Coelba initiated ‘Operação Gatonet’ to remove irregular telephony and internet cables from utility poles in Salvador and 22 other municipalities to reduce fire risks and visual pollution.

In other regions, Neoenergia Elektro reported the removal of over 7 tons of unauthorized telecommunications cables and equipment from utility poles. This operation, which included significant removals in Rio Claro, Pirassununga, and Limeira, aims to improve public safety and prevent accidents, fires, or structural collapses caused by irregular installations.

## Timeline

### 2026-10-27: Neoenergia Elektro removes 7 tons of irregular cables in Brazil

Neoenergia Elektro removed over 7 tons of unauthorized telecommunications cables in Brazil to improve safety and reduce visual pollution.

2 sources. https://clstr.news/cluster/neoenergia-elektro-removes-7-tons-of-irregular-cables-in-brazil

### 2026-10-22: Neoenergia conducts operations and addresses service complaints in Brazil

Neoenergia is addressing power fluctuations in Cabrobó and conducting a large-scale operation to remove irregular cables across 25 cities in Bahia to prevent fires and outages.

2 sources. https://clstr.news/cluster/neoenergia-conducts-operations-and-addresses-service-complaints-in-brazil

---
Cite as: Neoenergia infrastructure and service management in Brazil. CLSTR, https://clstr.news/situations/neoenergia-infrastructure-and-service-management-in-brazil
