# Oosterweel infrastructure works in Antwerp

> Live situation record from CLSTR: https://clstr.news/situations/oosterweel-infrastructure-works-in-antwerp
> Updated: 2026-09-15T11:15:00.000Z. Sources: 15. Developments: 2.

The Oosterweel connection programme in Antwerp is causing significant traffic disruptions on the Antwerp Ring (R1) through a series of infrastructure works and preparatory measures.

Initial disruptions include the full closure of the Deurne on-ramp to the R1 for a 36-hour period in early September, forcing motorists toward Ghent and Brussels to use the Borgerhout interchange. 

Further major shifts are scheduled throughout the autumn. These include the opening of a new underpass in Deurne in mid-September, followed by the opening of new sections of the Bypass—a temporary highway along the Ring—during late September and late November.

## Timeline

### 2026-09-15: Regional community events and infrastructure updates in Belgium and the Netherlands

A series of regional community events, local festivals, and infrastructure updates are scheduled across Belgium and the Netherlands, including traffic changes in Antwerp and various cultural gatherings.

12 sources. https://clstr.news/cluster/antwerp-ring-to-face-major-traffic-disruptions-this-autumn

### 2026-09-02: Antwerp Deurne on-ramp to close for Oosterweel works

The Deurne on-ramp to the Antwerp Ring (R1) will close from Friday night, September 4th, until Sunday morning, September 6th, for Oosterweel project works.

5 sources. https://clstr.news/cluster/antwerp-deurne-on-ramp-to-close-for-oosterweel-works

---
Cite as: Oosterweel infrastructure works in Antwerp. CLSTR, https://clstr.news/situations/oosterweel-infrastructure-works-in-antwerp
