# Santa Catarina highway infrastructure projects

> Live situation record from CLSTR: https://clstr.news/situations/santa-catarina-highway-infrastructure-projects
> Updated: 2026-09-08T19:33:36.000Z. Sources: 5. Developments: 2.

Infrastructure activities are underway in the Santa Catarina region to manage traffic and improve connectivity near the BR-101 highway.

In Balneário Camboriú, the concessionaire Arteris Litoral Sul scheduled maintenance for ventilation jets in the Morro do Boi Tunnel. The work, intended to ensure air renewal and smoke control, involved a total closure of the tunnel during the night of September 1 and partial lane restrictions on the night of September 2.

Simultaneously, construction has progressed on the Morro do Encano road to connect Itapema and Camboriú. Following rock detonations to widen the track, the project has moved into earthmoving and drainage phases. This road is being developed as a ‘escape route’ to alleviate heavy congestion on the BR-101 highway.

## Timeline

### 2026-09-08: Morro do Encano roadworks advance to relieve BR-101 traffic

Roadwork on the Morro do Encano road in Santa Catarina has progressed to new stages, aiming to provide a traffic relief route for the BR-101 highway between Itapema and Camboriú.

2 sources. https://clstr.news/cluster/morro-do-encano-roadworks-advance-to-relieve-br-101-traffic

### 2026-08-27: Morro do Boi Tunnel to undergo maintenance and closures

The Morro do Boi Tunnel on the BR-101 in Balneário Camboriú will undergo maintenance on September 1-2, featuring a total closure during the early hours of September 2.

4 sources. https://clstr.news/cluster/morro-do-boi-tunnel-to-undergo-maintenance-and-closures

---
Cite as: Santa Catarina highway infrastructure projects. CLSTR, https://clstr.news/situations/santa-catarina-highway-infrastructure-projects
