# Solar infrastructure implementation at MSAC

> Live situation record from CLSTR: https://clstr.news/situations/solar-infrastructure-implementation-at-msac
> Updated: 2026-10-02T05:13:00.000Z. Sources: 4. Developments: 2.

The Melbourne Sports and Aquatic Centre (MSAC) has completed the installation of a 1.3 MW rooftop solar system. Managed by the Next Green Group, the project utilized AIKO’s Comet series All Back Contact (ABC) modules to exceed the original 850 kW tender by more than 50%.

The installation addressed structural complexities, including the venue’s curved roof and various shading obstacles. The shade-tolerant technology enabled a flush-mount design that maximizes energy capture. Operated by the State Electricity Commission, the system is expected to generate over 1 GWh of renewable electricity annually, meeting roughly one-quarter of the facility’s energy needs.

## Timeline

### 2026-10-02: Melbourne Sports and Aquatic Centre installs 1.3 MW solar system

Next Green Group has installed a 1.3 MW rooftop solar system at Melbourne's Sports and Aquatic Centre, using advanced AIKO ABC modules to overcome shading and structural challenges.

2 sources. https://clstr.news/cluster/melbourne-sports-and-aquatic-centre-installs-13-mw-solar-system

### 2026-09-21: Meliá ME Marbella Banús installs high-efficiency solar system

The Meliá ME Marbella Banús hotel has installed a 116.16 kWp photovoltaic system using Aiko ABC modules to balance high energy needs with luxury architectural aesthetics.

2 sources. https://clstr.news/cluster/meli-me-marbella-bans-installs-high-efficiency-solar-system

---
Cite as: Solar infrastructure implementation at MSAC. CLSTR, https://clstr.news/situations/solar-infrastructure-implementation-at-msac
