# Turkish telecommunications digital and energy investments

> Developing situation record from CLSTR: https://clstr.news/situations/turkish-telecommunications-digital-and-energy-investments
> Updated: 2026-11-09T12:32:30.000Z. Sources: 16. Developments: 2.

During the COP31 summit in Antalya, Turkish telecommunications companies announced major initiatives regarding digital infrastructure and renewable energy.

Türk Telekom has officially commenced construction on a 300 MWp solar power plant in the Darende district of Malatya. The groundbreaking ceremony was conducted via a live 5G connection from the COP31 conference, attended by Minister of Transport and Infrastructure Abdulkadir Uraloğlu. Spanning 4 million square meters, the facility is expected to produce 470 GWh annually, accounting for roughly 36 percent of the company’s projected 2025 energy consumption. The project aims to prevent approximately 294,000 tons of carbon emissions each year and is slated to become Turkey’s third-largest solar plant.

The Malatya project will be rolled out in stages: the first 150 MW section is expected to be commissioned in January 2028, with full completion by September 2028. This follows a 128 MWp installation in Sivas and includes upcoming projects in Ağrı. Through these efforts, Türk Telekom aims to reach a total installed capacity of 530 MWp, targeting a 65 percent renewable energy share for its total consumption by 2025.

In addition to energy projects, Türk Telekom and SANKO Holding launched Turkey’s first 5G smart port project at TBH Port Adana, utilizing Private LTE and 5G architectures to optimize operations. Separately, Turkcell announced a 3 billion dollar investment in data center infrastructure, with plans to bring a hyperscaler to Turkey by the second half of 2028.

## Claims

- Türk Telekom is building a 300 MWp solar power plant in Malatya. (reported by 2 sources)
- Türk Telekom and SANKO Holding launched Turkey’s first 5G smart port project at TBH Port Adana. (reported by 1 source)
- Turkcell is investing 3 billion dollars in data center construction. (reported by 1 source)
- Turkcell expects a hyperscaler to arrive in Turkey by the second half of 2028. (reported by 1 source)
- The Malatya solar plant aims to prevent 294,000 tons of annual carbon emissions. (reported by 1 source)
- Turkcell has a 54 megawatt data center capacity. (reported by 1 source)
- The shell construction of three new Turkcell data centers is planned to be completed in December. (reported by 1 source)
- The Malatya solar project will be Turkey’s third largest solar power plant. (reported by 1 source)

## Timeline

### 2026-11-09: Türk Telekom and Turkcell announce major digital and energy investments

Turkish telecom giants Türk Telekom and Turkcell are investing heavily in 5G smart ports, large-scale solar energy plants, and 3 billion dollars worth of data center infrastructure.

5 sources. https://clstr.news/cluster/trk-telekom-and-turkcell-announce-major-digital-and-energy-investments

### 2026-11-09: Türk Telekom breaks ground on 300 MWp solar plant in Malatya

Türk Telekom has broken ground on a 300 MWp solar power plant in Malatya, Turkey, via 5G connection at COP31. The project aims to provide 36 percent of the company's 2025 energy needs.

12 sources. https://clstr.news/cluster/trk-telekom-and-aselsan-to-launch-domestic-smartphone-in-2027

---
Cite as: Turkish telecommunications digital and energy investments. CLSTR, https://clstr.news/situations/turkish-telecommunications-digital-and-energy-investments
