started · updated
Airbus considers second A350 production line and new A350-2000 model
Airbus is considering the establishment of a second final assembly line for its flagship A350 wide-body aircraft to meet rising market demand. Lars Wagner, head of Airbus's commercial aircraft division, stated in Toulouse that increasing the production rate is inevitable, as the current single line in Toulouse faces physical limits in reaching the company's goal of 12 aircraft per month by 2028.
The proposed second line is expected to incorporate advanced automation and robotics to modernize production processes. Additionally, Airbus is formally evaluating the development of a new, longer variant dubbed the ‘A350-2000’. This model would feature an extended fuselage compared to the current A350-1000 and is being developed in response to explicit requests from major airline customers.
Airbus is currently drafting business scenarios for the A350-2000, with a target market entry potentially before the mid-2030s. This move positions Airbus to compete directly with Boeing’s potential development of a ‘777-10X’ in the ultra-large aircraft market.
Entities
Airbus · Boeing · Lars Wagner · Toulouse