started · updated
Azerbaijan coordinates TRIPP technical parameters with US and Armenia
Azerbaijani Foreign Minister Jeyhun Bayramov announced that technical parameters for the Trump Route for International Peace and Prosperity (TRIPP) project are being coordinated through a joint technical working group. The project, which involves a 42-kilometer section through Armenia’s Syunik region, requires coordination because its entry and exit points are located on the Azerbaijan-Armenia border.
Established at the initiative of the United States, the trilateral working group began operations on November 6. The group is tasked with coordinating technical specifications for three specific areas: railways, highways, and electricity transmission lines.
Bayramov noted that while negotiations regarding the project's implementation have primarily occurred between the United States and Armenia, Azerbaijan must participate in determining specifications due to the corridor's connection to its territory. Azerbaijan reported that its own related road and railway infrastructure works are nearing completion, with construction toward the Armenian border expected to be finished by early 2027.
Entities
Armenia · Azerbaijan · Jeyhun Bayramov · TRIPP · United States