started · updated
Broken Hill Mines lifts silver output with new ore sources
Broken Hill Mines reported a 21.8% increase in silver production for the June quarter, reaching 95,787 ounces, while zinc output rose 7% to 3,331 tonnes and lead fell 3.9% to 2,376 tonnes. The boost came as higher‑grade ore from the Main Lode deposit and the newly‑restarted Pinnacles mine joined the long‑standing Western Min feed at the Rasp processing plant, giving the operation three distinct ore sources. Quarterly throughput hit 119,320 tonnes, the highest quarterly volume since June 2020, and the plant recorded 17 of its 20 highest‑throughput days.
Exploration continued with about 12,500 m of drilling across Rasp and Pinnacles, including a significant intercept at the Centenary Zone. The company generated A$9.1 million of operating cash flow and ended the quarter with A$53 million in total liquidity, including A$34 million in cash. Investment of A$8.3 million was made in growth projects, notably the tailings dewatering plant slated for commissioning in early 2027.
Entities
Broken Hill Mines · Main Lode deposit · Pinnacles mine · Rasp mine · Western Min operation