API
< Back to all clusters
[BUSINESS] · Vietnam · 2 sources

started · updated

Can Tho begins preparations for 27 trillion VND Can Tho 2 Bridge project

The Can Tho People's Committee has initiated procedures to implement the Can Tho 2 Bridge and approach roads project, following investment approval from the Ministry of Construction. The project involves three components: compensation, support, and resettlement in Vinh Long province, compensation, support, and resettlement in Can Tho city, and the construction of the main works.

The bridge and its approach roads will span approximately 17.6 km. The main bridge crossing the Hau River will be about 870 m long and is designed to accommodate both road and rail traffic. The upper level will feature a 6-lane expressway with a design speed of 100 km/h, while the lower level will house a double-track railway with speeds of up to 160 km/h for passenger trains and 120 km/h for freight.

Located approximately 4.5 km downstream from the existing Can Tho Bridge, the new structure will connect the My Thuan - Can Tho expressway at the Cha Va junction in Vinh Long to the Can Tho - Hau Giang expressway at the IC2 junction in Can Tho. The total estimated investment is over 27,050 billion VND, funded by the central government budget. The project aims to improve transport connectivity in the Mekong Delta and reduce pressure on the current Can Tho Bridge.

Entities

Can Tho 2 Bridge · Can Tho People's Committee · Hau River · Ministry of Construction · Vĩnh Long