started · updated
Cantabria tenders 3.7 million euro expansion for Laredo port
The Government of Cantabria has launched a tender for the expansion of the Laredo port, with an estimated investment of 3.75 million euros. The project, managed by the Ministry of Development, aims to expand the docking line and the unloading zone for the fishing fleet.
The works are expected to take 18 months to complete. The plan includes the construction of a new 150-meter docking line in the northern area of the fishing basin and approximately 3,500 square meters of space to facilitate unloading operations.
Cantabria President María José Sáenz de Buruaga stated that the expansion addresses long-standing demands from the Laredo Fishermen's Guild. The improvements are intended to increase operational capacity, particularly during peak periods for anchovy and greenling fishing, by reducing waiting times and improving working conditions.
Entities
Government of Cantabria · Laredo Fishermen's Guild · Laredo Port · María José Sáenz de Buruaga
Claims
What the coverage asserts, and how many sources carry each claim.
- [○ 1 SOURCE] The expansion will provide approximately 3,500 square meters for unloading operations. www.ifomo.es
- [○ 1 SOURCE] The project includes a new 150-meter docking line in the northern zone of the fishing basin. www.ifomo.es
- [○ 1 SOURCE] The Government of Cantabria has tendered works for the expansion of the Laredo port. www.ifomo.es
- [○ 1 SOURCE] The investment for the Laredo port expansion is 3.75 million euros. www.ifomo.es
- [○ 1 SOURCE] The execution period for the port works is 18 months. www.ifomo.es