started · updated
Chernobyl containment structure requires 500 million euros for repairs
The European Bank for Reconstruction and Development (EBRD) reports a 500 million euro funding gap required to repair the New Safe Confinement structure at the Chernobyl nuclear site. The massive steel construction, which protects the remains of reactor 4, was damaged by a Russian drone strike in February 2025.
EBRD President Odile Renaud-Basso stated that while there is no immediate danger, repairs must be completed by 2030 to prevent moisture from causing corrosion to the equipment underneath. Such damage would make the management of radioactive material significantly more difficult and expensive.
While G7 nations pledged 260 million euros in October, more funding is needed. A donor conference co-hosted by France, Ukraine, and the EBRD is scheduled for November 9 in Paris to secure additional commitments. The EBRD aims to award contracts by 2028 to begin a two-year repair process.
Entities
Chernobyl · European Bank for Reconstruction and Development · G7 · Odile Renaud-Basso · Ukraine