API
< Back to all clusters
[BUSINESS] · United States · 2 sources

started · updated

Chicago rail infrastructure projects aim to improve accessibility and service frequency

Metra has announced a Systemwide Network Plan designed to transition the Chicago-area rail system toward all-day regional service by 2026. The proposal, titled Regional Rail 1.0, envisions trains arriving as frequently as every 15 minutes and introduces through-running service to connect routes on opposite sides of downtown. This shift aims to better serve the 30% of regional travel that occurs outside of traditional downtown commutes. The plan involves approximately $2.7 billion in capital investments and an additional $269 million in annual operating expenses, with implementation scheduled between 2027 and 2035.

Simultaneously, a $112 million project is underway at Chicago Union Station to install level boarding platforms. Known as the Platform 30-38 Project, the 30-month initiative will convert former mail and parcel platforms into passenger platforms that comply with the Americans with Disabilities Act. These new platforms will allow passengers to board trains without the use of ramps, stairs, or lifts. The project also includes the construction of a climate-controlled waiting area and will provide interim capacity during future modernization efforts at the station.

Entities

Amtrak · Chicago Union Station · Clark Construction · Metra · WSP USA