API
< Back to all clusters
[BUSINESS] · Czechia · 6 sources

started · updated

Czech infrastructure: Prague Ring Road and Svor bypass updates

The construction of the Prague Ring Road section between Běchovice and the D1 highway is now expected to be completed in 2028. Former Prime Minister Andrej Babiš noted that the project, which involves extensive tunneling, has a cost of approximately 72 billion CZK. The delay from the original 2027 target is attributed to unexpected geological conditions. Meanwhile, the Road and Motorway Directorate (ŘSD) continues land acquisitions for the northern sections, with total costs estimated to exceed 10 billion CZK.

In a separate development, the Svor bypass in the Českolipsko region has officially opened after a 40-year wait. The nearly two-kilometer road cost approximately 550 million CZK excluding VAT. Designed to relieve the heavily congested I/9 road, the bypass aims to divert roughly 13,000 daily vehicles, including transit traffic to Germany, away from residential areas. The project includes 156 meters of noise barriers, though local residents have raised concerns regarding the adequacy of sound protection.

Entities

Andrej Babiš · Ivan Bednárik · Prague Ring Road · Svor · Ředitelství silnic a dálnic