started · updated
DPM Metals BH responds to allegations of improper mining waste management
DPM Metals BH has denied allegations from the Atelje za društvene promjene (ACT) Foundation regarding the mismanagement of mining waste at the Rupice mine in Vareš. The company maintains that the material, generated during underground drilling, has not been definitively classified as hazardous waste.
According to the company, multiple independent laboratory tests conducted through three different facilities assessed the material as non-hazardous. While one laboratory result suggested a need for further testing, DPM Metals BH asserts that the company has complied with inspection orders by moving 1,496.56 tons of material to the Veovača II landfill and has implemented stricter handling protocols pending final verification.
Conversely, the ACT Foundation claims that official documentation from the Federal Inspection Affairs Administration reveals that hazardous mining waste was treated as non-hazardous. The Foundation alleges that relevant laboratory findings were not presented to inspectors and that hundreds of tons of waste were deposited at the Veovača II site despite inspection measures requiring proper remediation. These concerns follow reports of elevated lead concentrations in the blood of Vareš residents and potential pollution of the Vrući Potok stream.