started · updated
Ecatepec invests 55 million pesos in Tulpetlac infrastructure
The Ecatepec municipal government has completed a 55 million peso infrastructure project in the Tulpetlac area, specifically targeting Calle Pinos and Avenida Principal. The project, inaugurated by Mayor Azucena Cisneros Coss, involved the repaving of 237 linear meters of roadway using hydraulic concrete.
In addition to road improvements, the works included a comprehensive rehabilitation of water and drainage networks that had suffered from decades of neglect. The funding for these improvements was provided by the Municipal and Territorial Demarcation Social Infrastructure Contribution Fund (Faismun).
According to Carlos Ramírez Brassetti, the municipal director of Public Works, the project directly benefits 900 residents, while providing indirect benefits to more than 20,000 people in the La Cruz Tulpetlac, El Ostor, and Lomas de San Carlos neighborhoods. Mayor Cisneros Coss stated that the administration intends to continue improving the region near the Sierra de Guadalupe through further paving, median repairs, and urban furniture installation.
Entities
Azucena Cisneros Coss · Carlos Ramírez Brassetti · Ecatepec · Sierra de Guadalupe