started · updated
Enersa renovates lighting at Provincial Museum of Fine Arts
Enersa has completed an integral renovation of the electrical installations and lighting at the Provincial Museum of Fine Arts in Paraná, Argentina. The project was carried out as part of the celebrations for the museum's centennial.
The renovation focused on improving electrical safety and energy efficiency while enhancing the building's historical architecture. Technical improvements included a complete replacement of the wiring, the addition of appropriate electrical protections, the installation of ornamental lighting, and the use of timer clocks to manage lighting schedules.
Using LED technology, the new lighting design was specifically engineered to highlight the museum's architectural features, such as its columns, pilasters, arches, and crown, without altering the heritage structure. The project also included lighting for the museum's courtyard. This initiative was conducted in collaboration with the Secretariat of Culture and the General Directorate of Museums and Heritage of Entre Ríos.
Entities
Enersa · Entre Ríos · Paraná · Provincial Museum of Fine Arts · Secretariat of Culture
Claims
What the coverage asserts, and how many sources carry each claim.
- [● 2 SOURCES] The project was a collaboration between Enersa, the Secretariat of Culture, and the General Directorate of Museums and Heritage of Entre Ríos. lagacetaonline.com.ar · www.redesdenoticias.com.ar
- [● 2 SOURCES] Enersa completed an integral renovation of the electrical installations and lighting at the Provincial Museum of Fine Arts in Paraná. lagacetaonline.com.ar · www.redesdenoticias.com.ar
- [● 2 SOURCES] The renovation improved electrical safety and enhanced the museum's historical architecture using LED technology. lagacetaonline.com.ar · www.redesdenoticias.com.ar
- [● 2 SOURCES] The lighting renovation was part of the celebrations for the museum's centennial. lagacetaonline.com.ar · www.redesdenoticias.com.ar
- [● 2 SOURCES] The LED lighting design was specifically intended to highlight the building's columns, pilasters, arches, and crown. lagacetaonline.com.ar · www.redesdenoticias.com.ar
- [● 2 SOURCES] The technical works included replacing all wiring, adding electrical protections, installing ornamental lighting, and adding timer clocks. lagacetaonline.com.ar · www.redesdenoticias.com.ar