started · updated
Dominican Republic electrical grid modernization and maintenance updates
The Empresa de Transmisión Eléctrica Dominicana (ETED) has announced scheduled maintenance and infrastructure strengthening for Saturday, October 31, 2026. These works involve the Palamara–INCA and Palamara–Novoplast 69 kV lines, which will cause temporary power interruptions across various communities in the Santo Domingo province, including Pedro Brand, Pantoja, and several industrial parks.
To support long-term grid modernization, ETED and the Inter-American Development Bank (IDB) have initiated technical dialogues with the national commercial banking sector. This collaboration aims to streamline contractual guarantees for future infrastructure tenders. The initiative is linked to a US$156 million IDB financing operation intended for equipment upgrades and substation expansions in San Francisco de Macorís, Azua II, Guerra, and Guayubín to improve the reliability of the National Interconnected Electric System (SENI).
Separately, the Empresa Distribuidora de Electricidad del Este (EDEEste) has condemned an act of aggression involving two technicians from a contractor, ATAL CARIBE, against a citizen in Santo Domingo Este. The company has demanded the immediate removal of the involved individuals from all tasks related to the distributor.
Entities
ATAL CARIBE · Dominican Republic · Empresa Distribuidora de Electricidad del Este · Empresa de Transmisión Eléctrica Dominicana · Inter-American Development Bank · Santo Domingo · Sistema Eléctrico Nacional Interconectado