started · updated
ETED announces maintenance on 69 kV transmission lines in Dominican Republic
The Dominican Electricity Transmission Company (ETED) has announced scheduled maintenance and improvement works on 69 kV transmission lines from September 29 to October 2. These operations aim to preserve infrastructure and enhance the stability and reliability of the National Interconnected Electric System (SENI).
Specific interventions include replacing deteriorated structures on the Pimentel–Hatillo line in Sánchez Ramírez province, the Santiago–SAJOMA line in Santiago de los Caballeros, and the Villa Duarte–Timbeque I line. Maintenance is also planned for the Cruce de Cabral I–Duvergé–Jimaní line. These works will cause temporary power interruptions in various communities and may affect several local businesses and industries.
In a separate development, the Office for the Protection of Electricity Consumers (Protecom) has launched an online Electric Bill Calculator. This tool allows users to verify their billed amounts, compare consumption between months, and view the breakdown of subsidies provided by the state.
Entities
Empresa de Transmisión Eléctrica Dominicana · Protecom · Santiago de los Caballeros · Sistema Eléctrico Nacional Interconectado · Sánchez Ramírez