started · updated
Eumseong County initiates intensive maintenance of bridge drainage facilities
Eumseong County has launched an intensive maintenance project for drainage facilities on 111 bridges under its management to prevent safety accidents and improve road conditions.
Due to the structural characteristics of bridge drainage systems and expansion joints, debris such as soil and fallen leaves often accumulate. If left unmanaged, these materials can clog drainage holes and allow vegetation to grow in crevices, hindering rainwater drainage and causing water to pool on bridge surfaces. This can lead to driving instability, flooding during heavy rain, or icing during winter.
The maintenance initiative prioritizes bridges on urban planning roads, those with frequent civil complaints, and locations at high risk of flooding or icing. Key tasks include cleaning clogged drains and pipes, removing accumulated sediment and debris, and clearing overgrown vegetation around bridge structures. To ensure efficiency, the county has organized 13 road maintenance workers into three teams operating under a regional management system. Additionally, the county has designated the second week of every month as ‘Bridge Drainage Facility Maintenance Week’ for regular, systematic inspections.