started · updated
European grid operators map industrial equipment needs through 2035
ENTSO-E has released an assessment of supply needs for transmission system operators covering the period from 2026 to 2035. The report aims to provide industrial manufacturers with visibility regarding potential orders for critical infrastructure, including transformers, cables, and high-voltage equipment, to facilitate investment and workforce training.
The study monitors seven major equipment categories: switching gear, power transformers and shunt reactors, overhead lines, underground and submarine cables, reactive power compensation, and high-voltage direct current (HVDC) converters. This planning is considered essential for grid security, as specialized components often cannot be replaced quickly with standard parts.
Three primary drivers are pressuring these supply chains: the ongoing energy transition and electrification, the phase-out of equipment using SF6 gases due to European regulations, and the necessary replacement of aging assets installed during the 1980s and 1990s.
In France, RTE and Enedis are testing a common flexibility portal across ten departments in the Southwest. This initiative allows for coordinated power modulation between the two networks, enabling industrial sites or households to adjust power usage to relieve saturated lines or facilitate maintenance. Market participants can connect via the Epex Spot European electricity exchange.