started · updated
Foresea adapts Norbe VIII drillship for shallow water operations
Foresea has completed the installation of innovative technologies on the Norbe VIII drillship, enabling the unit to operate in shallow waters at depths of less than 400 meters. Originally designed for deep and ultra-deepwater operations, the vessel is now equipped to handle well abandonment and decommissioning projects.
Developed in partnership with Petrobras and international manufacturers, the modernization integrates three distinct technologies into a single system. This allows the vessel to use dynamic positioning without the need for seabed anchoring, reducing environmental impact on the seafloor.
The integrated system includes the Reactive Flex Joint from TechnipFMC to reduce wellhead overload, the K-BOS shear ram from Kinetic to ensure rapid and safe well disconnection during emergencies, and the Neosight riser analysis technology from Stress Engineering. Neosight provides real-time analysis of environmental conditions and riser integrity to calculate safe disconnection limits.
Entities
Foresea · Kinetic · Norbe VIII · Petrobras · TechnipFMC