< Back to all clusters
[POLITICS] · Spain · 2 sources

started · updated

Granada begins comprehensive remodeling of Plaza de Gracia

The Mayor of Granada, Marifrán Carazo, has inspected the ongoing comprehensive remodeling of Plaza de Gracia and Músico Vicente Zarzo street in the Ronda district. The project, executed by Osepsa and Emasagra, covers a total area of 6,405 square meters and is expected to take eight months to complete.

The renovation aims to improve urban accessibility and modernize local infrastructure, including water supply, sanitation, and public lighting networks. Initial work has focused on the demolition of 1,034 square meters of pavement and the renewal of utility conduits.

Key features of the redesigned space include: - A 301-square-meter inclusive children's playground with adaptive equipment such as accessible swings and climbing structures. - A 47-square-meter walkable recreational fountain equipped with LED lighting. - The addition of 36 new trees and integrated seating areas made of concrete, wood, and galvanized steel. - Five contemporary pergolas with adjustable LED lighting designed to organize and unify the layout of local hospitality terraces.

Entities

Emasagra · Marifrán Carazo