started · updated
Helsinki cancels Humallahden bridge construction project
Helsinki officials have decided to halt the planning and construction of the Humallahden bridge, a proposed 200-meter structure intended to connect the Munkkiniemi cycling route. The project, which carried an estimated cost of at least seven million euros, was withdrawn due to safety concerns raised by the Prime Minister’s Office and criticisms regarding its impact on valuable coastal nature and maritime landscapes.
Local political groups, including the Helsinki National Coalition Party, expressed satisfaction with the decision, citing the disproportionate cost relative to the benefits. Instead of the bridge, officials are considering alternative plans to improve cycling connectivity by utilizing Paciuksenkatu, which would involve converting one driving lane into a two-way bicycle path. Detailed street plans are expected to be finalized within the coming year.
Entities
Helsinki · Humallahden silta · Matias Pajula · National Coalition Party · Paciuksenkatu · Prime Minister’s Office