started · updated
Ho Chi Minh City faces persistent traffic congestion and safety risks
Ho Chi Minh City is grappling with significant traffic challenges, ranging from chronic congestion on major thoroughfares to high-risk road conditions for motorcyclists. On Pham Van Dong Boulevard, despite its wide lanes, heavy congestion persists during peak hours, particularly at intersections with Phan Van Tri and Nguyen Xi streets. This is attributed to the high volume of vehicles connecting various city districts and the bottleneck effect caused by narrower intersecting roads. The Ho Chi Minh City Department of Construction plans to address 15 of 28 high-risk congestion points between 2026 and 2027, with the Pham Van Dong - Phan Van Tri intersection scheduled for intervention in 2027.
In other areas, such as Nguyen Duy Trinh Street near the Phu Huu port cluster, motorcyclists face life-threatening conditions. Narrow roadways force two-wheeled vehicles to navigate between large trucks and containers, often with minimal clearance. Recent fatal accidents have highlighted the dangers posed by blind spots and the lack of space when heavy vehicles pass one another on constricted paths.
To alleviate pressure on major arteries, local authorities in Nhieu Loc Ward are renovating alleyway networks, such as Alley 210 connecting Cach Mang Thang 8 and Nguyen Phuc Nguyen streets. These improvements aim to provide alternative routes to bypass major intersections like the Dan Chu roundabout, while simultaneously improving urban living standards.
Entities
Department of Construction of Ho Chi Minh City · Ho Chi Minh City · Nhieu Loc Ward · Pham Van Dong Boulevard · Phu Huu Port