started · updated
Ho Chi Minh City flood control project prepares Mương Chuối sluice operation
The Mương Chuối sluice control house, acting as the central command hub for a 10,000 billion VND flood control project in Ho Chi Minh City, is prepared for operation. Located in Nhà Bè District, this facility serves as the “brain” for managing eight major tidal control sluices within the project designed to mitigate flooding caused by climate change.
The facility utilizes SCADA technology to monitor and control water levels and sluice gates. When tides rise, the system regulates gates to prevent seawater intrusion, and when water levels allow, it facilitates drainage. The Mương Chuối sluice itself is the largest in the system, featuring a 160-meter span and an integrated lock for waterway traffic.
Trung Nam Group, the project developer, plans to conduct continuous trial runs to test technical parameters and system synchronization. A live demonstration of the integrated tidal control system is scheduled for November 25, with full operations expected to commence around November 30.
Entities
Ho Chi Minh City · Mương Chuối sluice · Nhà Bè District · Trung Nam Group