started · updated
Vande Bharat Express hits 100 kmph on Kashmir rail route
The maximum permissible speed on the 111-km Katra-Banihal section of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) has been increased from 75 km/h to 100 km/h. This change follows successful speed trials conducted on Friday.
During the testing, a Vande Bharat Express (Train No. 26401/26404) reached 100 km/h while crossing the Chenab Bridge, recognized as the world’s highest railway arch bridge, and the Anji Khad Bridge, India’s first cable-stayed railway bridge.
Union Railways Minister Ashwini Vaishnaw described the milestone as a significant achievement for Indian engineering. The speed enhancement is expected to reduce travel times, improve operational efficiency, and provide faster, safer, and more comfortable journeys for passengers traveling between the Kashmir Valley and the rest of the country.
Entities
Anji Bridge · Anji Khad Bridge · Ashwini Vaishnaw · Chenab Bridge · Udhampur-Srinagar-Baramulla Rail Link · Vande Bharat Express
Claims
What the coverage asserts, and how many sources carry each claim.
- [● 3 SOURCES] The speed increase will reduce travel time and provide faster, safer, and more comfortable journeys. navabharat.com · www.bhaskarhindi.com
- [● 3 SOURCES] Vande Bharat Express (26401/26404) successfully completed trials at 100 km/h. navabharat.com · www.bhaskarhindi.com
- [● 3 SOURCES] The speed increase is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. navabharat.com · www.bhaskarhindi.com
- [● 3 SOURCES] The Vande Bharat Express crossed the Chenab Bridge and the Anji Bridge at 100 km/h during trials. navabharat.com · www.bhaskarhindi.com
- [● 3 SOURCES] The maximum permitted speed on the 111 km Katra-Banihal section has been increased from 75 km/h to 100 km/h. navabharat.com · www.bhaskarhindi.com