started · updated
Iran gas shortage from Pars South Phase 14 platform accident compensated
Musa Ahmadi, head of the Iranian Parliament's Energy Commission, announced that the gas shortage caused by an accident at the Pars South Phase 14 platform has been compensated. According to Ahmadi, timely management by the Ministry of Petroleum and rapid actions by operational units ensured that the required gas was supplied through other platforms.
In addition to covering the deficit, the measures resulted in a daily increase of 3 million cubic meters in the country's total gas production capacity. Ahmadi noted that the Energy Commission recently met with Ministry of Petroleum officials to review the incident, the extent of the damage, and the reconstruction plans.
Reconstruction studies and initial actions began the day after the accident occurred. Ahmadi emphasized the need for accelerated reconstruction to return the platform to service as soon as possible. He also called for strengthening safety infrastructure, non-combat defense, and improving maritime, aerial, and medical emergency services in oil and gas operational zones.
Entities
Iranian Parliament · Ministry of Petroleum · Musa Ahmadi · National Iranian Gas Company · Pars South