started · updated
JR Central completes track level construction at Kanagawa Maglev Station
JR Central has announced the completion of the track level construction for the future Kanagawa Prefecture Station (tentative name) on the Chuo Shinkansen Maglev line. Located approximately 30 meters underground in Sagamihara City, the third basement level structure is designed to accommodate two main lines for high-speed transit at 500 km/h, alongside platforms and secondary lines.
The station facility, situated on the former site of Aihara Prefectural High School, spans a length of 680 meters and a maximum width of 50 meters. Construction is being managed by a joint venture including Okumura Corporation, Tokyu Construction, and Keio Construction. To facilitate the project, excavated gravel is being temporarily stored on-site to be reused for backfilling once construction is complete.
During a recent public event, “Sagamihara Maglev Festa 2026,” local residents and students were given a rare view of the underground site. Officials, including Kanagawa Governor Yuji Kuroiwa and JR Central Vice President Takanori Mizuno, attended the event. Work is now progressing to the second basement level, with the station's full completion expected around 2030.
Entities
JR Central · Kanagawa Prefecture Station · Sagamihara · Takanori Mizuno · Yuji Kuroiwa