started · updated
Kenya Railways reports 40% completion of Voi-Taveta railway project
Kenya Railways has announced that the rehabilitation of the 120-kilometer Voi-Taveta metre-gauge railway is 40 per cent complete. The Ksh5 billion project involves work on subgrade preparation and cross-drainage structures along the stretch that runs from the Mombasa-Nairobi main line at Voi to Taveta, near the Tanzania border.
The project aims to revive a route that has been dormant for over two decades. Once finished, the line will link Kenya’s railway network to Tanzania via the Holili border, facilitating cross-border trade, lowering transport costs, and stimulating regional tourism. The rehabilitation also includes the renovation of railway stations at Voi, Mwatate, Bura, Maktau, and Taveta.
To support regional logistics, a dry-port facility is being developed at Voi to establish the town as a strategic hub. Managing Director Philip Mainga noted that the ongoing works are already generating employment for local residents and supporting businesses within Taita-Taveta County.
Entities
Kenya Railways · Philip Mainga · Tanzania · Taveta · Voi