started · updated
King River Resources launches 11,000m drilling program in Western Australia
King River Resources has commenced its largest drilling campaign to date at the Mindoolah gold project in the Murchison region of Western Australia. The 11,082-metre reverse-circulation (RC) program is a phase-two initiative designed to probe eight priority targets located approximately 70 kilometres north-west of Cue.
The drilling will focus on three primary targets: Excelsior, the Demagnetised Target, and the Excelsior Repeat. The Excelsior target will undergo 3,252 metres of drilling to test for gold extensions beneath the historical open pit at depths of up to 354 metres. The Excelsior Repeat, an untested area northeast of the original pit, will receive 1,710 metres of drilling, while the Demagnetised Target will be tested with 3,150 metres.
Managing Director Graham Gadsby noted that the company is entering a catalyst-rich period as the drilling begins and an aeromagnetic survey commences this month.
Entities
Cue · Graham Gadsby · King River Resources · Mindoolah gold project · Murchison
Claims
What the coverage asserts, and how many sources carry each claim.
- [● 3 SOURCES] The Excelsior drilling will reach depths of up to 354 metres.
- [● 3 SOURCES] King River Resources launched an 11,082-metre reverse-circulation drilling campaign.
- [● 3 SOURCES] The drilling program is located at the Mindoolah gold project in Western Australia's Murchison region.
- [● 3 SOURCES] An aeromagnetic survey is commencing this month.
- [● 3 SOURCES] The Excelsior Repeat target will receive 1,710 metres of drilling.
- [● 3 SOURCES] The Demagnetised Target will be tested with 3,150 metres of drilling.
- [● 3 SOURCES] Excelsior will receive 3,252 metres of drilling.
- [● 3 SOURCES] The campaign targets eight priority locations.