API
< Back to all clusters
[BUSINESS] · Nigeria · 3 sources

started · updated

Lagos-Ibadan Expressway gridlock caused by bridge construction

Resumed construction on a pedestrian bridge in the Aseese area of the Lagos-Ibadan Expressway caused massive traffic gridlock on Wednesday. The congestion affected both directions of the highway, with delays stretching from the Redemption Camp area to the Aseese bus stop on the Lagos-bound lane, and from the Long Bridge area to Aseese on the Ogun-bound lane.

Motorists reported extreme delays, with some spending eight hours traveling between Mowe and Magboro. The situation was exacerbated by drivers attempting to bypass the congestion by driving against the flow of traffic. Some commuters abandoned their vehicles to trek long distances, while commercial motorcyclists reportedly increased fares significantly to transport stranded passengers through alternative routes.

Local motorists expressed frustration regarding the timing of the construction work, noting that the daytime activity worsened the congestion during a period of increased travel ahead of the festive season.

Entities

Aseese · Lagos-Ibadan Expressway · Magboro · Mowe · Redemption Camp