started · updated
Maritana Minerals reports high-grade gold extensions at Boorara
Maritana Minerals has completed a 119-hole reverse circulation drilling campaign at its Boorara gold project near Kalgoorlie, Western Australia. The drilling results identified significant high-grade gold intersections, including 36 metres at 3.53 grams per tonne beneath the planned southern open pit. This specific intersection included a 1-metre interval at 62.44 grams per tonne.
Other notable results from the campaign include 20 metres at 7.77 grams per tonne and various intersections supporting the continuity of gold-bearing contact lodes. The company noted that mineralisation appears wider in certain areas than previously interpreted. Drilling beneath Pit 4 confirmed that mineralisation extends below the current pit design and remains open at depth.
These findings will inform a revised mineral resource estimate scheduled for the March 2027 quarter. Maritana Minerals is targeting a mining restart at the Boorara site in mid-2027, with the project intended to serve as a key ore source for the company’s Black Swan processing hub.
Entities
Black Swan · Boorara · Grant Haywood · Kalgoorlie · Maritana Minerals