< Back to all clusters
[BUSINESS] · Greece, Cyprus, France · 46 sources

started · updated

Meridiam becomes majority shareholder in Greece‑Cyprus Great Sea Interconnector

On 5 August 2026 the Greek government signed a series of agreements at the Maximos Mansion in Athens to revive the Great Sea Interconnector (GSI) project linking the electricity grids of Greece and Cyprus. French infrastructure investor Meridiam acquired a majority stake of more than 50 % in the special‑purpose company GSI, providing additional capital and expertise. The Independent Power Transmission Operator (IPTO) remains a strategic shareholder and retains technical leadership of the project, which will have a transmission capacity of up to 2 GW.

The €1.9 billion interconnector, designated a European Union Project of Common Interest, has already secured €657 million from the Connecting Europe Facility. A three‑party agreement with cable manufacturer Nexans was also signed to commence seabed‑survey work, with the surveys expected to be completed by the end of 2026. Greek Prime Minister Kyriakos Mitsotakis called the deal a “strong vote of confidence” in Greece’s energy sector and a step that will end Cyprus’s energy isolation, while French President Emmanuel Macron expressed daily interest in the project’s progress. The partnership is seen as strengthening regional energy security and supporting the EU’s renewable‑energy integration goals.

Entities

ADMIE · Cyprus · Great Sea Interconnector · Great Sea Interconnector (GSI) · Greece · IPTO (ADMIE) · Independent Power Transmission Operator (IPTO) · Independent Power Transmission Operator (IPTO/ADMIE) · Kyriakos Mitsotakis · Meridiam · Nexans

Claims

What the coverage asserts, and how many sources carry each claim.

Sources

about 2 months ago