started · updated
Mexico State uses drones for Mexicable Line 3 construction
The Government of the State of Mexico has begun installing 9,500 meters of steel cable for the Mexicable Line 3 in Naucalpan. High-technology drones are being utilized to deploy a 19-millimeter diameter guide cable, which serves as the first stage of a three-part process.
The installation involves specialists from Italy who will perform the traction of the final cable, followed by a final stage of tensioning and electromechanical system integration. The project currently reports a 74.71 percent overall progress, with foundation work 100 percent complete.
Once operational, the 11-station system aims to reduce travel times to the Cuatro Caminos Metro to approximately 30 minutes, benefiting roughly 700,000 residents in the high-altitude areas of the municipality. The infrastructure will also include sensors to monitor wind speed, direction, and real-time operational safety. The project represents an investment of approximately 4,000 million pesos.
Entities
Cuatro Caminos Metro · Delfina Gómez Álvarez · Government of the State of Mexico · Mexicable · Naucalpan