started · updated
Munich Airport begins construction on 400 million euro arena
Construction has officially commenced on the Munich Arena, a major 400 million euro project located at the western edge of Munich Airport. The indoor venue, designed to hold up to 20,000 people, is scheduled to open in 2029.
The arena features an ambitious engineering design, utilizing a hybrid wood and steel roof structure to achieve a 100 meter span without internal supports. This roof is engineered to support over 200 tons of stage technology.
As part of the campus development, Hilton has announced plans for Tempo by Hilton Munich Airport Arena, which will be the company’s first lifestyle brand hotel in Germany. The 199-room hotel will cater to active, urban travelers with specialized amenities including a fitness center, a cafe, and a rooftop bar. The project is being developed by Allresto Munich Airport Hotel and Restaurants GmbH, a subsidiary of the airport operator.