started · updated
Myriad Uranium reports preliminary drilling results at Lucky Cliff
Myriad Uranium Corp. has announced preliminary uranium-equivalent results from its Phase-II drilling program at the Lucky Cliff site within the Copper Mountain project. The results, derived from gamma probe measurements, indicate several mineralized sections exceeding 100 ppm eU3O8.
To date, the company has completed four drill holes totaling 716.6 meters. The longest mineralized section recorded was 19.96 meters with a grade of 269 ppm eU3O8, while the highest intercepted grade reached 1,336 ppm eU3O8.
The company noted that these radiometric estimates are not chemical analyses and require confirmation through laboratory testing. The drilling program aims to verify historical mineralization estimates and collect modern data to support a future initial mineral resource estimate.