started · updated
British Columbia's Pear Lake wildfire expands to 124,656 hectares
The Pear Lake wildfire in British Columbia’s Cariboo region was estimated at 124,656 ha on 4 p.m. Aug 4, 2026. Eight evacuation orders were in place, affecting roughly 8,000 residents and 7,300 properties, while 37 evacuation alerts covered about 7,100 people and 3,800 properties. The province’s wildfire service reported 117‑120 active fires, with six large incidents, and described fire conditions as “explosive” due to unprecedented fuel dryness and winds of 85‑100 km/h.
Provincial officials said a state of emergency has not been declared; local emergencies across the province give authorities the powers needed. Resources are being drawn from Alberta and from international partners, including firefighters from Mexico and Australia. The response includes about 238 firefighters, 95 pieces of heavy equipment, 24 helicopters and 213 structure‑protection crews. Canada Post issued red and yellow service alerts for several communities, and a fallen tree (“treepedo”) has blocked southern Highway 1 access to Boston Bar, forcing long detours for residents returning home.
Heat and smoke are expected to intensify in the Kamloops area as the wildfire season peaks, with forecasters warning of continued dry conditions and the possibility of dry lightning.
Entities
BC Wildfire Service · British Columbia · British Columbia Wildfire Service · Bryce Moreira · Cliff Chapman · Clinton, British Columbia · Forests Minister Ravi Parmar · Fraser Valley Regional District · Green Lake, British Columbia · Kelly Greene · Kevin Dunbar · Ladysmith Fire/Rescue Department
Claims
What the coverage asserts, and how many sources carry each claim.
- [● 12 SOURCES] Bryce Moreira provided a video update on the Pear Lake fire on August 3.
- [● 13 SOURCES] Mark Healey, incoming incident commander, said protecting life and property is the top priority for the Pear Lake fire response.
- [● 13 SOURCES] The BC Wildfire Service deployed 279 firefighting personnel, 24 helicopters, 86 pieces of heavy equipment and 214 structural protection units to the Pear Lake fire.
- [● 13 SOURCES] The BC Wildfire Service has over 500 structural and wildland firefighters assigned to the Pear Lake fire.
- [● 13 SOURCES] Strong gusty winds from a cold front intensified the Pear Lake fire.
- [● 13 SOURCES] Evacuation alerts and orders remain for the Village of Clinton, the Chasm area along Highway 24, 70 Mile House and both sides of Green Lake.
- [DISPUTED] The Pear Lake fire remains listed at 115,250 hectares in size.
- [● 8 SOURCES] The Pear Lake fire is one of several large wildfires in the region, alongside French Bar Creek and Bonanza Lake.
- [● 2 SOURCES] Another 200‑plus Mexican wildfire personnel are expected to arrive later in the week.
- [● 2 SOURCES] The Brunswick Complex fire has caused the closure of the southern access road to Boston Bar, with a fallen tree (“treepedo”) blocking Highway 1.
- [● 2 SOURCES] British Columbia had 126 active wildfires on August 3, 2026, with nine igniting in the previous 24 hours.
- [● 2 SOURCES] Residents near Boston Bar have been advised to prepare supplies and expect long detours due to road closures.