started · updated
Pljevlja Thermal Power Plant critical for Montenegro energy stability
Nikola Madžgalj, Executive Director of Elektroprivreda Crne Gore (EPCG), stated that the stable operation of the Pljevlja Thermal Power Plant (TE) is essential for the reliability of Montenegro's electricity system. He noted that a reliable thermal plant allows hydroelectric plants and reservoirs to reach their full potential, particularly during periods of good hydrology.
Management expects the plant to produce over 1.3 million megawatt-hours (MWh) by the end of the year, exceeding 2024 production levels despite scheduled maintenance. From the beginning of the year through September, the block delivered over one million MWh to the system, surpassing the nine-month plan by five percent. In September alone, the plant operated for 720 hours without breakdowns, producing 136,580 MWh.
Madžgalj highlighted that the thermal plant, alongside the Perućica and Piva hydroelectric plants, forms the foundation of national production. He also announced plans to expand renewable energy through international cooperation, including the expected establishment of a joint venture with the company Masdar based on an intergovernmental agreement with the United Arab Emirates.
Entities
Elektroprivreda Crne Gore · Masdar · Montenegro · Nikola Madžgalj · Pljevlja Thermal Power Plant