Ponte della Botte Bridge Closed for Gas Network Works July 18‑20, 2026
The Ponte della Botte bridge in Vicopisano, Tuscany, will be completely closed to vehicular and pedestrian traffic from 07:00 UTC on Saturday 18 July until 24:00 UTC on Monday 20 July 2026. The closure enables a gas‑network intervention by Toscana Energia, involving the replacement of dielectric joints at the pipe ends to improve safety and efficiency.
Alternative routes have been signposted, and public transport will operate on temporary itineraries with possible suspension of some stops. Local authorities advise motorists to plan journeys accordingly and follow the posted detours to minimise disruption.
The shutdown is scheduled during the summer school break to reduce traffic impact, and the bridge will reopen once technical checks confirm safe conditions.